PF series impact crusher is able to crush the materials whose length of a side is between 100~500mm and maximum compression strength is 350Mpa, the crushed materials are usually in the form of cube, so it is suitable for crushing medium hard materials such as limestone in cement plant, sand and rock production in the industry of roads, railways, reservoir, electricity power, building materials and so on, the finished size of granite below 40mm could reach to 90%.
Working principle
The feed enters the primary crushing chamber and meets the breaker bars which impel the feed against the front breaker plate. This action and the collision of material against new feed results in impact reduction. Material is sufficiently reduced in the primary chamber and passed by the front breaker plate, entering the secondary chamber for final reduction. Breaker plates are shaft suspended at the front and from a spindle in the rear, allowing for continuous gap adjustment as wear progresses and assuring superior product control.
Model | Size of rotor (mm) | Feed opening (mm) |
Max. feed size (mm) |
Capacity (t/h) | Power of Motor (kW) |
Weight (t) |
PF1010 | Φ1000×1050 | 400×1080 | 350 | 50-80 | 75 | 12.5 |
PF1210 | Φ1250×1050 | 400×1080 | 350 | 70-130 | 110 | 16.5 |
PF1214 | Φ1250×1400 | 400×1430 | 350 | 90-180 | 132 | 19 |
PF1315 | Φ1320×1500 | 860×1520 | 500 | 120-250 | 200 | 24 |
PF1320 | Φ1320×2000 | 860×2030 | 500 | 160-350 | 260 | 27 |
Adantage of Impact crushers
PF impact crusher is usually used as secondary or tertiary crusher to crusher the not less harder materials with Mosh hardness less than
5.5, the following materials is the favourite of impact crusher.
|
|
Besides supply complete impact crusher machine, we also supply impact crusher spare parts, including impact plates, side plates, impact hammer or blow bar.
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?
Contact Person : | Dolly.Du |
---|